GridPulse Operations PortalSCADA LIVE

Smart Campus Microgrid Telemetry โ€ข 22 Buildings โ€ข 42 Sub-Meters โ€ข Neon Serverless Cloud

NEON CLOUD
00:00:00
50.02 Hz
45ms
Sync:
๐Ÿงญ Architecture & Pipeline (/howItWorks)Analytics Studio

Welcome to GridPulse: Autonomous Campus Microgrid & SCADA Command Center

Monitoring 42 IoT sub-meters across 22 campus facilities. Use the tabs below to view real-time power telemetry, test AI peak-shaving dispatch, or inspect the facility electrical hierarchy.

Total Campus Power Demand
621.4kW
โ— 1.0s High-Freq Stream22 Facilities Online
Active Sub-Meters & Stream
42/ 42 Online
โšก 37,962 frames (+42/s)100% Ingestion
Grid Voltage & Frequency
415.2V
PF: 0.942Freq: 50.02 Hz
Automated Dispatch Status
CURTAILMENT+85.5 kW Alert
Contract: 800 kW3-Tier Rules Armed

Hostel Ghost Load & Unoccupied Room Waste Intelligence Engine

PHASE 11 โ€ข NILM MLSimulated data โ€ข demo controls

Autonomous detection of unattended split ACs and lighting left ON during academic lecture hours (Monโ€“Fri 10:00โ€“16:00). Uses non-intrusive wing smart meters with robust Median/MAD baselines and hysteresis state machines. Zero hardware cost per room.

Active Wasted Load
14.4kW
Target Wing: BH1 (M001)+14.4 kW excess
Financial Loss Today
โ‚น634INR
Cumulative: 79.2 kWh@ โ‚น8.0/kWh
COโ‚‚ Emissions Today
64.9kg COโ‚‚
Campus ESG Impact0.82 kg/kWh
Unattended ACs Active
4Units
NILM Signature1.5 Ton Inverter AC

Robust Baseline Band vs Live Telemetry (Boys Hostel 1 - Wing A (Ground & 1st Flr))

Academic Hours (10:00โ€“16:00). Red highlighted spikes indicate confirmed unattended waste events exceeding Z > 2.5 for โ‰ฅ 45 mins.

CRITICAL GHOST LOAD
Observed kWMedian BaselineNormal Envelope (ยฑ1.4826 MAD)
Academic Hours: Mon-Fri 10:00โ€“16:00

Waste Simulation Lab

Hysteresis Elevated Duration:
48 mins
0m (Reset)45m (Trigger Gate)90m (Sustained)
Wi-Fi AP Connected Clients:
2 devices
Waste Confidence:97% Empirical Confidence
Simulated Breaker Soft-Trip:
SIMULATED

Simulates remote breaker trip on vacant wing sub-circuits. Protected with software safety interlock.

Auto-Alert Telegram:

Campus Hostel Sub-Meter Telemetry Matrix (All 12 Wings)

Click any wing to focus the diagnostic charts and simulation controls above.

12 Sub-Meters Synchronized
Meter IDHostel & WingMedian BaseObserved kWExcess kWPower FactorRobust Z-ScoreState MachineNILM Disaggregated Signature
M001
Boys Hostel 1
Wing A (Ground & 1st Flr)
12.4 kW26.8 kW+14.4 kW0.78Z: 5.39CRITICAL_ALERTLikely Unattended AC (~4 units active)
M002
Boys Hostel 1
Wing B (2nd & 3rd Flr)
11.8 kW12.2 kW0.0 kW0.94Z: 0.18NOMINALNominal Baseline
M003
Boys Hostel 1
Wing C (4th & 5th Flr)
12.0 kW12.5 kW0.0 kW0.93Z: 0.21NOMINALNominal Baseline
M004
Boys Hostel 2
Wing A (Ground & 1st Flr)
13.5 kW14.1 kW0.0 kW0.95Z: 0.21NOMINALNominal Baseline
M005
Boys Hostel 2
Wing B (2nd & 3rd Flr)
13.0 kW13.4 kW0.0 kW0.92Z: 0.16NOMINALNominal Baseline
M006
Boys Hostel 2
Wing C (4th & 5th Flr)
12.8 kW13.1 kW0.0 kW0.93Z: 0.11NOMINALNominal Baseline
M007
Boys Hostel 3
Wing A (Ground & 1st Flr)
14.2 kW14.8 kW0.0 kW0.94Z: 0.19NOMINALNominal Baseline
M008
Boys Hostel 3
Wing B (2nd & 3rd Flr)
13.8 kW14.2 kW0.0 kW0.93Z: 0.13NOMINALNominal Baseline
M009
Boys Hostel 3
Wing C (4th & 5th Flr)
14.0 kW14.5 kW0.0 kW0.92Z: 0.17NOMINALNominal Baseline
M010
Boys Hostel 4
Wing A (Ground & 1st Flr)
11.5 kW11.9 kW0.0 kW0.95Z: 0.17NOMINALNominal Baseline
M011
Boys Hostel 4
Wing B (2nd & 3rd Flr)
11.2 kW11.6 kW0.0 kW0.94Z: 0.18NOMINALNominal Baseline
M012
Boys Hostel 4
Wing C (4th & 5th Flr)
11.0 kW11.4 kW0.0 kW0.93Z: 0.19NOMINALNominal Baseline